Short answer
How is construction site supply planned?
What matters most on site is sequence: temporary power and HSE equipment must be on site before production equipment — otherwise the crew cannot start. Mobilisation demand is heavy and spans many categories at once (PPE, electrical, hardware, paint, site office, hygiene); collecting them on one list and turning that into one quote saves both time and cost.
At site tempo, a materials need appears in the morning and is expected by noon. Petty-cash purchases strain both cost control and documentation; central procurement can’t chase every urgent request.
AKSCO answers site requests fast within a framework set with your head office: field teams send the list, delivery goes site-door upon central approval, and every purchase stays on record with invoices and delivery notes. Setup lists at project start, regular replenishment throughout, completion needs at handover — we stay with the project throughout.
Sample request list for this industry
A site list changes with the works programme: PPE and temporary electrics come first at mobilisation, fasteners and cutting consumables in the rough works, paint and building chemicals in finishing. The groups below follow that flow.
- Mobilisation PPE set — Hard hats, goggles, work gloves, safety footwear, high-visibility vests; with site headcount and size breakdown.
- Work-at-height equipment — Harnesses and connecting gear; by number of crew.
- Temporary electrics — Cable, panel materials, fuses and residual-current relays; cross-section, amperage and IP rating go on the list.
- Site lighting — LED luminaires and site-lighting items; with area and mounting height.
- Hand tools and cordless tools — Tool sets, drills, cordless tools, measuring tools; branded and economy options can be priced side by side.
- Fasteners and anchors — Bolts and nuts, anchors, screws and fixings; by size and material class.
- Cutting and abrasive consumables — Drill bits, cutting and grinding discs; quantity and diameter go on the list.
- Paint, plaster and building chemicals — Interior and exterior paint, primer, plaster, render, insulation; with quantities, colour code and the surface to be covered.
- Site signs — Warning and prohibition signs, emergency-assembly wayfinding; size and quantity.
- Site office and welfare area — Desks, chairs, cabinets; stationery and printer consumables can join the same request.
- Cleaning and toilet consumables — Chemicals, paper products, bin liners; by number of people on site.
- Refreshments and drinking water — Tea, coffee, water and kitchen consumables; by headcount or monthly consumption.
Send the list the site manager already has, even a photo of a notebook page, through the quote form; we resolve the lines. For a multi-site contractor, adding a site code and project name column to the list makes cost tracking by project easier. For a first list, the site mobilisation checklist is a starting point.
Four dimensions defined to the centimetre
On a construction site there is no such thing as “suitable”. From edge protection to scaffolding the dimensions are written down. These four cause problems when ordered without a dimension — and an item ordered without a dimension is an item returned.
Numerical requirements on construction sites in Türkiye| Subject | Requirement | Basis |
|---|
| Guardrail dimensions | The main rail height, the intermediate gap and the toe board height are written into the specification as numbers; read the values in TS EN 13374. TS EN 13374 sorts edge protection systems into classes A, B and C — write the class into the specification | TS EN 13374 and the Regulation on OHS in Construction Works, Official Gazette 05.10.2013 / 28786 (amended: Official Gazette 31.12.2018 / 30642, 4th repeat; Annex 5 (B)) |
|---|
| Safety nets | System types S, T, U, V. The maximum fall height and the minimum catching width for each type are defined in TS EN 1263-1 and TS EN 1263-2 — read the values from the standard and write them into the specification | TS EN 1263-1 and TS EN 1263-2 |
|---|
| Façade scaffolding | The base plate area, the travel and engagement of the adjustable base, the passage width and the access opening are defined in TS EN 12810/12811 — read the values from the standard and write them into the specification. Above a height-to-base ratio of 4:1 it must be tied to the structure | TS EN 12810-1/-2 and TS EN 12811-1/-2/-3; TS 13662 for timber scaffolding. The 4:1 ratio is the practical rule the Ministry’s façade scaffolding guide carries over from OSHA. The erection, use and dismantling plan is drawn up by — or commissioned by — a civil engineer, construction technician or senior technician |
|---|
| Fall arrest force | The limit on the arrest force transmitted to the body and the webbing width requirements of a full body harness are defined in the standards — read the values from the standard | The arrest force limit comes from TS EN 355 (energy absorbers) and TS EN 363 (fall arrest systems); the webbing widths come from TS EN 361. A harness alone does not make a system — specify the absorber as well |
|---|
These are acceptance criteria, not preferences: material that cannot be measured and matched on site is returned. Write item + dimension + standard number into the mobilisation list, not just the item name.