Short answer
How do you set up central purchasing across many branches?
One structure that can work is a central agreement with direct branch delivery: price and supplier are fixed centrally, one order is placed, the supplier delivers to each branch with its own delivery note, and the invoice goes to head office (within 7 days of delivery, Tax Procedure Law art. 231/5; deliveries spread over a longer period are invoiced per delivery group). It keeps price control without the cost of a central warehouse and internal distribution.
The need arises at the branch, but purchasing sits at headquarters; there’s no company card and petty cash is limited. A branch employee’s request for “one box of paper” turns into head-office approval and a supply arrangement. We know this model inside out — AKSCO was built precisely for this flow.
We define standards and a price list with your head office once; your branches report their needs, and we ship from the approved list per location. Invoices are either separated by branch or consolidated on a single account — your accounting team’s choice.
Sample request list for this industry
In a multi-branch organisation the list is built on every branch buying the same lines in different quantities. The groups below show the standard pack head-office purchasing sends to branches next to the branch-specific headings.
- Paper, toner and filing — Copy paper, toner and cartridges, folders, desk items; with a monthly quantity table per branch.
- Printer consumables and IT accessories — Printers, network products and peripherals; the device model at each branch goes on the list.
- Cleaning and hygiene pack — Chemicals, paper towels, toilet paper, bin liners, dispensers; by branch floor area or headcount.
- Tea, coffee, water and catering — A standard monthly pack for staff kitchens; quantity by branch headcount.
- Branch tea-point equipment — Water dispensers, tea urns, coffee machines, fridges and serving ware; for a refresh or an opening.
- Branch opening and refurbishment furniture — Desks, chairs, meeting and archive furniture; by headcount or layout plan.
- Branch signs and floor plans — Emergency-exit signs, door nameplates, floor plans, notice boards; one definition keeps the design the same at every branch.
- Uniforms and branded apparel — Branded T-shirts, polos and vests; size breakdown per branch.
- Branch security equipment — IP cameras, recorders, alarm panels and access control; with camera count and retention period.
- Air-conditioning and ventilation filters — Filter size and class, or the label on the current filter; for bulk purchase ahead of the season.
- Entrance mats, carpet tiles and flooring — For a branch refurbishment, with floor area and usage class.
- Meeting-room screens and audio — Screens, video conferencing and microphones; with room size and viewing distance.
Sending the branch list and the item list as two separate sheets is enough: one with branch code, address, receiving person and phone; the other with items and the quantity per branch. Upload both as Excel through the quote form. If you keep the monthly standard pack and the branch-specific items on separate tabs, the quote can be organised in those two parts. For budgeting, see the office supplies budget guide.
Four duties that scale with headcount, not with branches
If a multi-site supply plan is built as “so much per branch”, these four items can come up short: they scale with the headcount and hazard class of each location instead.
Scaling rules for multi-site organisations in Türkiye| Subject | Requirement | Basis |
|---|
| Number of trained first-aiders | Low hazard: one per 20 employees · hazardous: one for every 15 employees or fewer · highly hazardous: one for every 10 employees or fewer | First Aid Regulation, Official Gazette 29.07.2015 / 29429, Article 19 |
|---|
| Validity of the first-aider certificate | Valid for 3 years; refresher training must be taken in the 3 months BEFORE the certificate expires — not after (rule reversed by the 27.12.2025 / 33120 amendment) | First Aid Regulation (Official Gazette 29.07.2015 / 29429), the article governing the first-aider certificate. Across many branches this is a recurring annual training line in the budget |
|---|
| Emergency support staff | Separately for each of the firefighting, rescue and protection teams: at least one support person per 30 (highly hazardous), 40 (hazardous), 50 (low hazard) employees; the first-aid team is set up separately. Drill at least once a year | Regulation on Emergency Situations in Workplaces, Official Gazette 18.06.2013 / 28681 (amended 01.10.2021 / 31615), Articles 11 and 13. In a workplace with fewer than 10 employees (any hazard class), one support person for all three teams is enough |
|---|
| Colour proportion on safety signs | Prohibition (circle): red ≥ 35%. Warning (triangle): yellow ≥ 50%. Mandatory (circle): blue ≥ 50%. Emergency exit and first aid: green ≥ 50%. Firefighting: red ≥ 50% | Health and Safety Signs Regulation, Official Gazette 11.09.2013 / 28762, Annex 2, 2.1: where natural light is poor, fluorescent colours, reflective material or artificial lighting shall be used |
|---|
When signage is bought for hundreds of branches at once, write the colour proportion into the specification and measure it on the sample: on a prohibition sign the red area must be at least 35%.